Skip to content

Shriram Deshmukh completed Energy and Renewable: Machine Learning for the Power Grid

  • Verified
  • Issued 2 August 2026

What Shriram demonstrated

Built a leakage-free turbine-yield predictor end to end: framed TEY as the target, excluded downstream CO/NOx emissions, trained a LinearRegression baseline and a tuned RandomForest, and validated on a locked later-period holdout. Reported honest held-out performance (about 1.5 MWh MAE, 1.9 MWh RMSE, R²≈0.98), checked residual behavior, and documented deployment limits plus a monitoring/retraining plan.

  • Leakage-Free Feature Selection
  • Time-Based Holdout Evaluation
  • Honest Residual Analysis
  • Plain-Language Model Communication

Earn a certificate like this one

Pick a challenge, work through it step by step, and earn a verified certificate of your own, graded by AI and shareable anywhere.

Start a challenge

Verified by ProoV · eed2bbe4f8d8a2ab…