Skip to content

Aashim completed Energy and Renewable: Machine Learning for the Power Grid

  • Verified
  • Issued 3 October 2026

What Aashim demonstrated

Built a leakage-aware turbine yield predictor end to end: framed TEY as a regression target, excluded downstream CO/NOx emissions, and validated on a genuine time-based holdout. Compared a LinearRegression baseline to a tuned RandomForest, then reported held-out MAE, RMSE, and R² with a residual read and a practical monitoring plan for drift.

  • Leakage-Free Feature Selection
  • Time-Based Holdout Evaluation
  • Baseline vs Ensemble Comparison
  • Residual-Based Error Reading

Earn a certificate like this one

Pick a challenge, work through it step by step, and earn a verified certificate of your own, graded by AI and shareable anywhere.

Start a challenge

Verified by ProoV · a2b389bd1f39ef3e…