Rim Mbarki completed Energy and Renewable: Machine Learning for the Power Grid
What Rim demonstrated
Built a leakage-free gas-turbine TEY predictor end to end: selected only the eight available sensor inputs, excluded downstream CO/NOx emissions, and validated on a locked-away later time period. Compared a LinearRegression baseline with a RandomForest, reported held-out MAE/RMSE/R², inspected residuals for bias, and documented deployment limits plus a concrete drift-monitoring plan.
- Leakage-Free Feature Selection
- Time-Based Model Validation
- Honest Error Analysis
- Operational Monitoring Design
Earn a certificate like this one
Pick a challenge, work through it step by step, and earn a verified certificate of your own, graded by AI and shareable anywhere.
Verified by ProoV · 856502ced388edc6…